What are the preparations for building a mineral processing plant?-2

Apr 03, 2020 Leave a message

2.Determination of the production capacity of the ore dressing plant


According to the address resources, the storage status of the deposit, the construction conditions of the enterprise and the technical and economical rationality, the production capacity of the ore dressing plant is determined.The determination of production capacity should be adapted to local conditions, and the production capacity of the ore dressing plant should be determined based on the mineral resources and the existing equipment or self-made equipment capabilities.

In the existing equipment or self-made equipment capacity, the production capacity of the beneficiation plant shall be determined by the production capacity of the grinding equipment. Generally, large-scale beneficiation plants are to be constructed in stages and batches; the production life is determined according to the reliable industrial storage of the mine.


3. Site Selection of Concentrator


1) Generally, resources should be concentrated to build factories. When suitable for decentralized building in terrain, mining, transportation, etc., it should be determined through multiple comparisons according to specific conditions.

2) The site should not be arranged on the ore body, nor within the slump limits and blast danger zones; use of mountain or wasteland, not occupying or occupying farmland, and if conditions permit, the dressing plant should be close to the mine source, Save ore transportation costs.

3) Special attention should be paid to the selection of the tailings when selecting the site. The ideal tailings should enable the tailings to flow by themselves, have a large volume, occupy less farmland, and not pollute river water and environmental hygiene.

4) The selected plant site should be located in the downwind direction of harmful gas. The sewage and soot discharged from the mineral processing plant shall not affect the lives of residents and the production of agriculture, animal husbandry and fishery.

5) The selected site should have good engineering geological conditions. The main plant building and the main equipment foundation should have good engineering geological conditions. It cannot be located in the quicksand layer, landslide layer, fault, etc. It must be above the flood elevation. Space for development.


What are the preparations for building a mineral processing plant?

Contact:
DESEN MINERAL PROCESSING EXPERT
Whatsapp:+8613319277356
Email:Desen@oremagnetic.com←Click on